Home
  Search Archives     
  Available Archives
   1969-1979
   1980-1989
   1990-1999
   2000-2009
   2010-2017
    1969    
    1969    
1970
1970
1970
1971
1971
1971
1972
1972
1972
1973
1973
1973
1974
1974
1974
1975
1975
1975
1976
1976
1976
1977
1977
1977
1978
1978
1978
1979
1979
1979
    1980    
    1980    
1981
1981
1981
1982
1982
1982
1983
1983
1983
1984
1984
1984
1985
1985
1985
1986
1986
1986
1987
1987
1987
1988
1988
1988
1989
1989
1989
    1990    
    1990    
1991
1991
1991
1992
1992
1992
1993
1993
1993
1994
1994
1994
1995
1995
1995
1996
1996
1996
1997
1997
1997
1998
1998
1998
1999
1999
1999
    2000    
    2000    
2001
2001
2001
2002
2002
2002
2003
2003
2003
2004
2004
2004
2005
2005
2005
2006
2006
2006
2007
2007
2007
2008
2008
2008
2009
2009
2009
    2010    
    2010    
2011
2011
2011
2012
2012
2012
2013
2013
2013
2014
2014
2014
2015
2015
2015
2016
2016
2016
2017
2017
2017

 
   2006 >> May >> Pole Replacement  

Pole Replacement
By David Collins

Reprinted from "Crown Jewels of the Wire", May 2006, page 23

Pole Replacement - From a layman's viewpoint

In March 2005 everyone in my neighborhood received notice from Pacific Gas & Electric Company that, due to the replacement of a power pole, electricity would be shut down for nine hours on the 21st of the month.

While overall reactions ranged from grumbling to a Iii stoic acceptance, mine was one of quiet anticipation. For, as it turned out, the pole to be replaced was a few feet from the corner on which my apartment building sits. Having not witnessed the process before, and coupled with my insulator interest, I decided to pursue that course. What I ultimately ended up with was fairly decent photo-documentation, some very good conversation with some very good people, and a couple pieces of local history.


After 80 years of service, all old pole and its glass insulators are 
scheduled for removal. Looking west down the street you 
call see the pole that was about to be replaced. 
The new pole is on the trailer to the right. On the 
left is my apartment building. Taking into account the narrow 
streets and tight intersections, the crew did quite 
a job jockeying the pole and trailer into position.

First, a bit of background. The building where I live was built in 1926, according to my building manager. Therefore, it would be plausible the building was wired during construction, particularly since the lighting fixtures do not appear to have been reworked from gas lighting.

On the morning of the 21st, with a full roll of film in the camera, I went downstairs about an hour or so after the crew showed up. The actual work was done by a private contractor, with a PG&E superintendent. The crew chief was at the super's truck, and during a break in their conversation I introduced myself and explained my interest. Both were agreeable to let me document the project.

The PG&E super told me the pole had probably been in place since 1920's, although the "can" (the transformer), already taken down and placed in the back of a pickup, was from the '50's.

The photo on the right shows the crew setting the replacement pole beside the old one. The crew chief, Jeff, explained that the topmost wires were to be worked "hot". I was surprised to learned that the lines are often worked while energized. I also learned that a fair amount of the wire (cable) that is used is of aluminum or aluminum alloy. As we talked and I took photos, the realization came that I was getting an education the average rate payer may be unaware of.

The above photo shows Jeff and a crew member preparing the new crossarms. In the foreground, Jeff is prepping the secondary crossarm (which will carry lower voltage lines) with porcelain unipart insulators. He used the drill on the ground behind him to make the holes for the galvanized insulator pins. Jeff explained that, as more poles are being replaced, galvanized pins are the norm. "Locust pins" (the old wooden ones) are literally falling to pieces. He told me that, more often than not, they break right off, in many cases without even having to remove the insulators. I believe the insulators were U-482's. They are white / sky tone glaze with radio-treatment on the saddles.

Earlier in the day, I mentioned my interest in insulators and said, if possible, I'd like to obtain something from the replaced pole. Jeff informed me he would see to it. Sure enough, when things began winding down, I asked if they'd found anything interesting. One of the crewmen brought over a canvas bucket. "You mean these? We just throw 'em away." He set out some insulators in the truck and I took the following photograph.

From left to right, the insulators are: a light green CD 162 McLaughlin; and olive green CD 162.1 Star; a CD 162 Star, an aqua CD 134 Star, a sun colored amethyst CD 162 California, and an unembossed aqua CD 170.1. The white arrows indicate the insulators which came my way. The "bucket man" got the olive green Star and the SCA California. He said it was the first he had personally seen in service.

It turned out that a couple of the other crew members took insulators home occasionally, but they were unaware people really collected them. Running upstairs, I returned with an issue of Crown Jewels magazine, and some photographs of my collection. Looking through the magazine seemed to enlighten the workers, particularly when they saw the show & tell articles and the advertisements.

Most of my time was spent observing and photographing; and I managed to run out of film before the job was completed. Here's a pic of the lineman and bucket operator removing the crossarms off the old pole.

On the right, a picture of the new pole in service.

Looking back, the day was quite an educational experience for me, too. It was the first time I had witnessed a pole replacement, something pretty much routine to the crew. My observations increased my respect not just for the work itself, but for the folks who go out there and perform the work. In the future, I will definitely think twice before grumbling when the power goes out!



| Magazine Home | Search the Archives |